Serving Kettering, Oakwood, Centerville, Dayton & the south suburbsCall (937) 884-4704

Replacement, widening and new aprons

Concrete Driveways in Kettering, OH

A new driveway for an older house, poured thick enough for today's vehicles and built to shed water and salt.

  • Free on-site estimate, with the old base checked before we price
  • Written, itemized quote: tear-out, base, thickness, finish, total
  • Air-entrained exterior mixes, planned joints and a proper cure

Replacing the Driveways Kettering Grew Up With

Concrete driveways are the biggest flatwork job most Kettering homeowners ever take on, and usually the one they put off longest. Many driveways in town went in with the house, and Point2Homes' summary of Census data puts the city's median year built at 1961. A driveway that age has been through six decades of freezing nights, snowplows, salt and heavier cars than it was designed for. When it finally breaks into loose plates or holds puddles at the garage door, patching rarely buys much time.

Signs it is time to replace

  • Cracks wide enough to catch a shovel blade, or slabs that rock when you drive on them
  • Sections that have sunk or tilted, so rain flows back toward the garage or house
  • Surface scaling: the top layer flaking off and exposing stones
  • A broken apron where the driveway meets the garage floor or the street
  • Tree roots lifting sections near the sidewalk
  • Old asphalt or concrete patches that keep failing

Inside a replacement job

Demolition comes first: the old slab is broken up, loaded and hauled off, which tells us what the original crew built on. On many postwar lots that turns out to be native clay with a thin skim of gravel or none at all, and that is usually why the panels sank. Soft pockets get dug out. The subgrade is shaped so water heads away from the house and garage, then gravel goes in and gets compacted. After forms and steel are set, the truck pours, the crew screeds and floats the surface, and a broom texture goes on for winter traction. Joints are tooled or sawn on a planned grid.

How thick, and whether to add steel

HomeGuide's driveway guide calls for a 4-inch minimum under ordinary cars, 5 to 6 inches where RVs or heavy trucks park, and edges thickened to 6 to 8 inches. Aprons and the edges where tires roll off are where we add depth first. Rebar runs roughly $1 to $3 more per square foot by HomeGuide's numbers; on a big slab, soft soil or a drive that carries a work truck it earns its cost, and on a small pad over firm gravel it may not. We go over that choice at the estimate.

Widening and new layouts

Many Kettering homes were built with a single-car driveway, and families now park two or three vehicles. Widening the driveway, adding a parking pad beside it or flaring the apron at the garage can take cars off the street. The City of Kettering says a driveway extension needs a zoning permit. If the work changes the approach at the curb, an Engineering Department right-of-way permit is needed too. We confirm which permits apply before we schedule.

The drive approach

The section between the public sidewalk and the street is the drive approach. The City of Kettering says property owners are responsible for the approach, curb and sidewalk next to their property, and any work there needs a right-of-way construction permit from Engineering. If your approach is cracked or sunken, it often makes sense to replace it with the driveway so the two match and drain together.

The first months

We give you a date for parking on it, typically around a week out and later in cool weather. No deicing salt the first winter; sand gives traction without attacking the young surface. Per HomeGuide, the first sealer goes on after the 28 to 30 day cure, with a fresh coat every 2 to 3 years. A plastic-edged blade or a snow blower is kinder to the finish than a steel shovel, and downspouts should discharge away from the slab edges.

What a Driveway Job Includes

A driveway job covers everything from tear-out to the first time you park on it.

Tear-out and haul-away

The old slab or asphalt broken up and hauled off before any new work starts.

Base rebuild

Soft soil dug out, then compacted gravel graded so water runs away from the house and garage.

Reinforcement

Rebar or wire mesh where the soil, size and load call for it, with thicker edges and aprons.

Air-entrained pour

Exterior mix placed, finished with a broom texture and jointed at the right spacing.

Apron and approach

The garage apron and the drive approach at the street, built to the City's right-of-way requirements where they apply.

Widening and pads

Extra width, side parking pads or a turnaround, with the City's zoning permit requirement confirmed first.

Stamped Concrete in Kettering, OH

Typical Concrete Driveway Costs

DrivewayPublished range
Per square foot, installed$6 to $15
One-car, 12x24 ft$1,700 to $4,300
Two-car, 20x20 ft$2,400 to $6,000
Two-car, 24x24 ft$3,500 to $8,600
Old driveway removal$2 to $6 per sq ft
Stamped driveway$8 to $26 per sq ft

National ranges from HomeGuide's concrete driveway cost guide. Kettering prices can differ, and tear-out, base repair, thickness, reinforcement and any City permits all change the total. Your written estimate is the price.

Driveway Job, Step by Step

1. Measure and inspect

We measure, check slope and drainage, and look at the old base, trees and the approach.

2. Tear out and rebuild the base

Old concrete comes out, soft spots are dug out, and gravel is compacted and graded.

3. Form and pour

Forms and reinforcement go in, then the air-entrained concrete is placed, finished and jointed.

4. Cure and hand back

You get dates for foot traffic, parking and the first coat of sealer.

Sidewalks & Steps in Kettering, OH

Concrete Driveways Questions

What does a new driveway cost in Kettering?

Nationally, HomeGuide lists about $6 to $15 per square foot. A 20x20 two-car driveway lands around $2,400 to $6,000 on that scale, and breaking out the old slab adds roughly $2 to $6 per square foot. You get a written quote once we have measured.

When can I park on a new driveway?

Walking on it is usually fine within a day or two. Cars generally wait about a week, longer when nights are cool. You get dates specific to your pour.

Do I need a permit to widen my driveway?

The City of Kettering says a driveway extension needs a zoning permit. If the work touches the apron or curb in the public right-of-way, an Engineering Department permit is also needed. We confirm both before we start.

Can you pour a driveway late in the fall?

Yes, with care. Concrete must not freeze while it cures, so late-season pours may need blankets and a mix adjusted for cold. A driveway poured in late fall should not get salt that first winter.

Should I replace the drive approach too?

If the approach is cracked, sunken or sits at a different height than your new driveway, replacing it at the same time usually looks and drains better. Approach work needs a City right-of-way permit and a final City inspection, so allow for that in the timeline.

Get a Concrete Driveways Estimate

Free on-site estimates for driveway replacement and widening in Kettering and nearby suburbs.

Call Now: (937) 884-4704